Basic design,detailed design,foundations and civil works,procurement of all electrical and mechanical equipment and construction and commissioning works for the electrical balance of plant of the wind farm, comprising a 33kV electrical gathering system a 33kV/150kV step up substation,4 circuits of 150kV transmission line and a tapping into South Sulawesi’s 150kV Grid system. The Sidrap Power Plant developed by UPC Renewables is Indonesia’s first wind farm.